self-employed consulting engineer |
| Period: | 04-2019 - 2022 |
| Investor: |
Stadtwerke München HKW Süd - Modernisierung GuD2 2020-2021 |
| Client: | SWM Service GmbH |
| Scope: | SWM-General Site Manager for the Renewing of the Gas Turbine Power Station GuD2 |
| With the following Scope of Installations and Equipment: | |
|
Replacement of the existing 15 year old GE Gas Turbines including Gas turbine, generator, and aux. Skids Exchange of the existing Transformers Installation of new bus duct systems and circuit breaker Installation of a new Turbine Control System Replacement of the Main Cooling System of the Site with 3 new Main water Pumps and new Piping System in existing Plant |
|
|
The following main tasks as to be executed: -Overall Coordination of all Dismantling and Installation works -Organisation of all logistic requirements as Delivery of heavy goods with all Suppliers. - Supervision of all Installation works of each supplier - Execution of walk down for mechanical completion, - Inspections of all punch items - Supervising of Full filling of all relevant permits by the authorities according permit process for start of the new Unit at 1. Fire |
|
|
-Coordination of all commissioning actions with all suppliers, existing units and operation staff -Evaluation of Claims, Contract deviations and change orders - Coordination of all measurement to ensure a high level of labour safety and environment protection (HSE measurements) - Head of the SWM-Site Management Team (Supervisor and Commissioning Teams) |
|
| Position: | General Site Manager for GuD2 Project by the Owner SWM |
| Duration: | approx. 40 months |
| Period: | 10-2017-03-2019 |
| Investor: | Pražské Služby-ZEVO Malesice |
| Client: | MARTIN GmbH für Umwelt- und Energietechnik GmbH |
| Scope: | Installation of the new Waste heated steam generator K4 in the existing Waste to Energy Facility Malesice-Prague |
| The new Boiler K4 includes especially: | |
|
o MARTIN reverse acting grate with 35 MW Gross heat input Waste Through put 13.3 t/h o One 5-pass steam generator with 39t/h live steam (14,5bar/320°C) o 1 Steam-Flue Gas-preheater o Auxilliary Systems e.g., Slag Discharing, Fly Ash Collection system in existing Silo, o Steam heating for Air Preheater o Incl. all electrical Installations and Process Control Systems |
|
| The following main tasks has been executed: | |
|
o Engineering for the scope of Unit K4including necessary extensions in the existing Plant o Preparation of inquiries, evaluation of bids, technical economical evaluation and contracting o Dismantling of the existing Units parallel to running other units o Installation of the new Equipment for new K4 o Coordination of all interfaces within and outside the scope and to the existing units o Coordination of commissioning with other lots and the existing units (3 old units, Flue Gas cleaning Plant a.o.) o Complete Services for Contract Handling up to Claim Management and billing with Owner EGM and sub-contractors |
|
| Position: | Responsible Project Manager for Martin GmbH in relation to all other project participants (Investor, Operator, Sub suppliers, authorities, a. o.) |
| Duration: | 18 months |
| Period: | 2015 - 2017 |
| Investor: | Infrastructure Expansion 2015 Penzberg IE15P |
| Client: | Roche Diagnostics GmbH |
| Scope: | Design, Construction and Commissioning of a new Energy Production Plant in Penzberg, Germany |
|
The Infrastructure expansion exists on the following main components: o Co Gen Unit with 4,4 MW P el o Heat recovery, steam generator for district heat o Pressurized Air Compressor Station o Pure Water production Unit 50 m³/h o Cooling Units (Cooling water, ice water, brine) o Transfer piping system to the consumers o Additional auxiliary systems, electrical installations and process control system |
|
|
The following main tasks have been executed: o Guidance and coordination of all Engineering Activities for the scope of IE15P o Review of inquiries for all sub contracted scopes, evaluation of bids and contracting the individual scope for sub-contractors o Supervising the construction of the complete mechanical and process equipment (Roche CM) o Coordination of all interfaces between all suppliers and the existing Units o Guidance of the Commissioning o Execution of trial run and performance test for the approval of the contractual guarantees before hand over to the User o After Sale Management for closing the project, o Supervising the open issues during warranty period o Reporting o Continuous Review of Time Scheduling |
|
| Position: | Responsible Project Coordination Manager for the IE15P in relation to all other project participants (Investor, Operator, sub suppliers, authorities, a. o.) |
| Duration: | 17 months |
| Period: | 2015 |
| Investor: | MVV Environment Devonport Ltd- Waste to Energy CHP Facility Plymouth |
| Client: | Imtech Deutschland GmbH & Co.KG |
| Interims Management for the installation, commissioning and performance test of a steam turbine-generator unit for the waste to energy plan Devonport Ltd. - Waste to energy CHP Facility Plymouth | |
| Scope: |
The Scope includes:
- Condensing Steam turbine, electrical Performance P El 25 MW |
| Position: |
As Interims Manager I was responsible on site for the finalization of the a. m. scope of delivery, especially for - Overall Coordination for all needed actions for Imtech as supplier of this lot - General Site Manager for this Scope - Leading the international Imtech-site team for finalization of construction, commissioning and trial run |
| Duration: | 8 months |
| Period: | 2010 - 2013 |
| Investor: |
Alpiq Power Generation s.r.o, Kladno Cz |
|
Client: |
Kraftanlagen Power Plants, Munich |
|
Scope: |
Installation of CFB Boiler for Unit 7 for Alpiq Generation in Kladno, Cz |
|
|
The following task has been done during the installation of this scope:
o Coordination of all needed services and deliveries from the supplier Foster Wheeler, especially:
o Guidance and approval of the engineering services for the complete scope of supply and performances
o Coordination and approval of all interfaces to all other suppliers and the existing installations
o Completion and approval of all needed documentation for the required permits
o Design approval of all drawings for the process design o Design approval of all interfaces to other equipment and the existing plant
o Specification for all documentations
o Control of the work progress in the steps of the project o Evaluation and control of the progress in all steps of the project
o Coordination with all other project participants as investor, authorities,
|
|
Position: |
Responsible Project Manager for this scope for the General Contractor KAP in relation to all other project participants |
|
Duration: |
37 months |
|
Language: |
English |
|
|
|
|
|
|
|
Period: |
2009 - 2010 |
|
Investor: |
Alpiq Power Generation s.r.o |
|
Client: |
Kraftanlagen München |
|
Scope: |
Assistance during the contracting for a Lignite fired fluidized bed incineration boiler Kladno K7, Cz
The scope of delivery exists mainly on: o 1 CFB Boiler with approx. 328 MW and steam production of approx. 105 kg/s (133 bar/531°C) o Flue Gas Cleaning System with SNCR und bag filter o Fuel Storage, additive systems, auxiliary systems for the unit
|
|
Position: |
Responsible Project Expert for the technical approval and evaluation of the pricing and economics of several offers
o Evaluation of all bids o Negotiations with all bidders o Execution of a technical and economical evaluation report o Presentation of a recommendation for the best bidder and possible selected suppler of this scope o Completion of all relevant contract documents |
|
Duration: |
7 months |
|
Language: |
English |
|
|
|
|
|
|
| Period: | 2006 - 2009 |
| Investor: |
EGM Entsorgungsgesellschaft Mainz GmbH, Germany |
| Client: |
MARTIN GmbH für Umwelt- und Energietechnik GmbH |
| Scope: |
Installation of Unit 3 for the Waste to energy Plant in Mainz
Unit 3 exists on the following main components:
o MARTIN reverse acting grate with 48 MW Thermal Performance o 4-drain steam generator with 55 t/h (42 bar/420°C) o 1 semi-dry/wet flue gas cleaning system o Additional auxiliary systems, electrical installations and process control system
The following main tasks has been executed:
o Engineering for the scope of Unit 3 o Preparation of inquiries for all sub contracted scopes, evaluation of bids and contracting the individual scope for sub-contractors o Supervising the construction of the complete mechanical and process equipment o Coordination of all interfaces to other suppliers and the existing Units 1 and 2 o Guidance of the Commissioning of Unit 3 o Execution of trial run and performance test for the approval of the contractual guarantees before hand over to the Investor EGM o After Sale Management for closing the project, claim management o Supervising the open issues during warranty period
|
| Position: |
Responsible Project Manager for the Consortium KOMA in relation to all other project participants (Investor, Operator, sub suppliers, authorities, a. o.) |
| Duration: | 40 months |
| Period: | 2006 |
| Investor: |
Stadtwerke Augsburg, Germany |
| Client: |
Stadtwerke Augsburg, Germany |
| Scope: |
Participation for the contracting of a bio fuel heat power station
Scope of delivery by a general contractor: o 1 Unit bio fuel grate firing system with 28 MW Gross heat performance 1 steam boiler with 27 Mg/h steam (65 bar/475 C) o 1 steam turbine with an electrical output of 7 MW o Extraction of district heat for the existing system o Flue gas cleaning with cyclone and electric precipitator
|
| Position: |
Responsible project expert for the technical and economically evaluation of all bids for the mechanical and process equipment
o Evaluation of all bids o Execution of technical clarification meetings o Preparation of a technical and economical evaluation report with recommendation of the best bidders o Detection and estimation of potential cost savings o Recommendation for the preferred supplier o Negotiation and completion of all needed contract documents |
| Duration: |
5 months |
|
|
|
|
|
|
| Period: |
2005 - 2006 |
| Investor: |
AMI GmbH, Austria |
| Client: |
RMD Consult, Munich |
|
Scope of Task/ Position:
|
Project Manager for a
Feasibility-Study and Preparation of Permit Engineering for Gas Power Station at the Industrial Site in Linz, Austria.
For the Home Consumption for the Site of AMI there was to investigate a power plant with approx. 56 MW Electricity Power, including o 1 Gas turbine 45 MW o 1 Waste Heat Boiler with 20 MW auxiliary firing o 1 Steam Generator with 65 bar/520°C, 15 MW o Steam extraction for process utilisation 16MW
Main Task have been:
o Basic Data Collection, inspection of site o Investigation of several solutions for the type of gas turbine, configuration of water steam cycle a. o.) o Pre-Design and clarification of interfaces to the existing site o Economic Investigations of Investment and operational costs
o Clarification of the conditions for the permit procedure with the local authorities and experts
o Preparation of the complete scope of permit documents according relevant laws
o Design of the layout and clarification of all interfaces within the different engineering disciplines
o Consulting during permit process to get the permit |
|
|
|
| Duration: |
4 months |
|
|
|
| Period: | 2006 |
| Investor: |
Smurfit Nettingsdorfer Papierfabrik GmbH, Austria |
| Client: |
EON Energy Projects, Munich |
|
Scope of Task/ Position:
|
Project Expert for the following tasks
Execution of a basic inspection in the paper mill for the preparation of inquiries for an industrial gas power station on the existing site in Nettingsdorf. For the home consumption of the existing paper mill it was to investigate the installation of a gas power station with an electricity output of 58 MW, including
1 Gas turbine with 45 MW 1 Waste heat boiler with 27 MW th 1 Steam generator (82 bar/480°C) and 3MWel
Main Task have been:
o Basic Data Collection, inspection of site o Investigation of several solutions for the type of steam turbine, configuration of water steam cycle a. o.) o Pre-Design and clarification of interfaces to the existing site
o Clarification of the conditions for the permit procedure with the local authorities and experts
o Preparation of the complete inquiry documentation for boiler, balance of plant for the water steam cycle, steam turbine, civil scope, auxiliary equipment
|
| Duration: | 4 months |